Public records from Washington DCYF, shown in full.
The playground equipment and ground surface from the previous provider has been removed. A new climber and ground cover has been ordered for an installation date of 8/30/2025. TA was given to use a park if in case, the outdoor space wasn’t installed on time. The plan would need to be approved by the supervisor. Playground equipment to be installed 8/30/2025, link to CSPC playground manual, was given to the Director for guidance for the installer of the equipment to follow. TA was given as the space where the climber will be placed, has a curved fence with different widths and not to have the slide or stairs near the fence or the wall.
Storage areas are observed unlocked and accessible to children as they just need to open the door walk in to have access to what is inside.
The full record for Chinese Information and Service Center Bilingual Preschool — and every other licensed provider in Seattle — opens in the Seattle directory.