Raymore · Licensed center

Landis Child Development Center

What the state has found

Routine visits: 12 of 12 cited something

Kansas City-area centers: the state cites something at about 8 in 9 routine visits.

Read every record and the state’s reports

State record — Missouri DESE Office of Childhood

Last visit
July 22, 2026
On file
12 visits since August 2023 — all of them cited findings
Fixed?
The latest correction deadline was July 22, 2026. Missouri DESE Office of Childhood does not publish whether it was made.
Most serious
Missouri DESE Office of Childhood does not publish a severity level for a citation, so there is no most-serious to name.

Missouri DESE marks every rule section of an inspection Compliance, Violation or Not Observed, and for each violation publishes the inspector’s observation, the rule quoted in full, the correction required and a deadline. A complaint investigation is published where the state substantiated a rule violation, with its disposition.

Jul 2026 Compliance monitoring visit 6 findings

Compliance monitoring visit · July 22, 2026

5 CSR 25-500.052 (2) (C) · Annual Requirements · Correction due February 3, 2026

The Family Care Safety Registry check was not conducted for D.A., S.B., E.F., K.F., C.H., S.H. M.H., V.K., K.O., J.S., K.S., J.T., B.W., A.W., and A.Z. within thirty (30) days prior to the anniversary date.

Required correction: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due February 18, 2026

Hazardous items as follows were accessible to children: M.D. creams and triple butt paste. The item(s) was/were located in the buckets under changing table and in plastic drawers next to the changing table.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due February 18, 2026

The walls located in hallway around the preschool bathrooms was/were not clean as evidenced by dirt on walls and door jams.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials · Correction due February 18, 2026

Furniture/equipment, sink counter, in boy's bathroom and in the 1 year old room was not in good condition as evidenced by cracking and unable to be cleaned properly.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

5 CSR 25-500.102 (3) (A) · Personnel · Correction due July 22, 2026

The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2025, the staff listed need the following information: E.F. needs 11 hours and Kerstin Olson needs 2 hours.

Required correction: Required training hours shall be documented for each caregiver.

5 CSR 25-500.102 · Personnel (4) (A) . · Correction due February 18, 2026

Safe sleep training was not completed within the past 3 years for the following staff D.A. and J.S.

Required correction: The director, group home provider, other caregivers, and those volunteers counted in staff/child ratio, shall complete department-approved safe sleep training as required.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Jan 2026 Reinspection visit 9 findings

Reinspection visit · January 20, 2026

5 CSR 25-500.052 (2) (C) · Annual Requirements

The Family Care Safety Registry check was not conducted for D.A., S.B., E.F., K.F., C.H., S.H. M.H., V.K., K.O., J.S., K.S., J.T., B.W., A.W., and A.Z. within thirty (30) days prior to the anniversary date.

Required correction: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due January 20, 2026

Hazardous items as follows were accessible to children: large containers of wall paint. The item(s) was/were located school age room.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers

Hazardous items as follows were accessible to children: M.D. creams and triple butt paste. The item(s) was/were located in the buckets under changing table and in plastic drawers next to the changing table.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers

The walls located in hallway around the preschool bathrooms was/were not clean as evidenced by dirt on walls and door jams.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.082 (3) (A) 3. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due January 20, 2026

The requirements for toilet and handwashing facilities were not met as evidenced by the toilet was not convenient for children's use.

Required correction: Bathroom fixtures shall be functional and convenient.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials

Furniture/equipment, sink counter, in boy's bathroom and in the 1 year old room was not in good condition as evidenced by cracking and unable to be cleaned properly.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

5 CSR 25-500.102 (3) (A) · Personnel

The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2025, the staff listed need the following information: E.F. needs 11 hours and Kerstin Olson needs 2 hours.

Required correction: Required training hours shall be documented for each caregiver.

5 CSR 25-500.102 · Personnel (4) (A) .

Safe sleep training was not completed within the past 3 years for the following staff D.A. and J.S.

Required correction: The director, group home provider, other caregivers, and those volunteers counted in staff/child ratio, shall complete department-approved safe sleep training as required.

5 CSR 25-500.112 (1) (A) · Staff/Child Ratios · Correction due January 20, 2026

Group size requirements were not met as evidenced by 9 children, ages 1-year-old, were cared for by 3 adult caregiver(s).

Required correction: Staff/child ratios and group sizes shall be maintained at all times.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Jan 2026 Compliance monitoring visit 10 findings

Compliance monitoring visit · January 14, 2026

5 CSR 25-500.052 (2) (C) · Annual Requirements

The Family Care Safety Registry check was not conducted for D.A., S.B., E.F., K.F., C.H., S.H. M.H., V.K., K.O., J.S., K.S., J.T., B.W., A.W., and A.Z. within thirty (30) days prior to the anniversary date.

Required correction: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers

Hazardous items as follows were accessible to children: M.D. creams and triple butt paste. The item(s) was/were located in the buckets under changing table and in plastic drawers next to the changing table.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers

The walls located in hallway around the preschool bathrooms was/were not clean as evidenced by dirt on walls and door jams.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.082 (3) (A) 3. · Physical Requirements of Group Day Care Homes and Day Care Centers

The requirements for toilet and handwashing facilities were not met as evidenced by the toilet was not convenient for children's use.

Required correction: Bathroom fixtures shall be functional and convenient.

5 CSR 25-500.082 (4) (D) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due January 14, 2026

The diapering area requirements were not met as evidenced by warm running water was not adjacent to the diapering area.

Required correction: The facility shall supply the diapering area as required.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers

Hazardous items as follows were accessible to children: large containers of wall paint. The item(s) was/were located school age room.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials

Furniture/equipment, sink counter, in boy's bathroom and in the 1 year old room was not in good condition as evidenced by cracking and unable to be cleaned properly.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

5 CSR 25-500.102 (3) (A) · Personnel

The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2025, the staff listed need the following information: E.F. needs 11 hours and Kerstin Olson needs 2 hours.

Required correction: Required training hours shall be documented for each caregiver.

5 CSR 25-500.102 · Personnel (4) (A) .

Safe sleep training was not completed within the past 3 years for the following staff D.A. and J.S.

Required correction: The director, group home provider, other caregivers, and those volunteers counted in staff/child ratio, shall complete department-approved safe sleep training as required.

5 CSR 25-500.112 (1) (A) · Staff/Child Ratios

Group size requirements were not met as evidenced by 9 children, ages 1-year-old, were cared for by 3 adult caregiver(s).

Required correction: Staff/child ratios and group sizes shall be maintained at all times.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Jul 2025 Supplemental visit 1 finding

Supplemental visit · July 16, 2025

5 CSR 25-500.182 (1) (C) 7. · Child Care Program · Correction due July 16, 2025

Physical punishment was used as evidenced by a child pulled down on a bench by one arm and then possible a slap on the back of the head. Please see notes page.

Required correction: Constructive, age-appropriate discipline shall be used; no physical punishment is permitted.

State licensing record

Feb 2025 Compliance verification visit 3 findings

Compliance verification visit · February 19, 2025

5 CSR 25-500.052 (2) (C) · Annual Requirements · Correction due February 19, 2025

The Family Care Safety Registry check was not conducted for D.A., S.B., E.F., V.K., N.L., K.O., J.P., J.S., J.T., H.R., B.W., A.Z., A.W., C.H., and C.H. within thirty (30) days prior to the anniversary date.

Required correction: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due February 19, 2025

The walls located in the infant classrooms 1, 2, and 3 was/were not in good condition as evidenced by chipping around the corners of the classrooms and baseboard needing repaired in infant 2.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials · Correction due February 19, 2025

Furniture/equipment, sink, in Preschool boy's bathroom was not in good condition as evidenced by chiping in counter top around sink, making it unable to be cleaned properly.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Jan 2025 Compliance monitoring visit 4 findings

Compliance monitoring visit · January 15, 2025

5 CSR 25-500.052 (2) (C) · Annual Requirements

The Family Care Safety Registry check was not conducted for D.A., S.B., E.F., V.K., N.L., K.O., J.P., J.S., J.T., H.R., B.W., A.Z., A.W., C.H., and C.H. within thirty (30) days prior to the anniversary date.

Required correction: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date.

5 CSR 25-500.082 (1) (G) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due January 15, 2025

The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that no plug was in the outlet.

Required correction: The facility shall use outlet covers or twist-lock outlets as required.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers

The walls located in the infant classrooms 1, 2, and 3 was/were not in good condition as evidenced by chipping around the corners of the classrooms and baseboard needing repaired in infant 2.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials

Furniture/equipment, sink, in Preschool boy's bathroom was not in good condition as evidenced by chiping in counter top around sink, making it unable to be cleaned properly.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Aug 2024 Compliance verification visit 2 findings

Compliance verification visit · August 14, 2024

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due August 13, 2024

The facility's outdoor space was not safe for children's activities as evidenced by missing parts of the covering matterial, leaving gaps and rises that are a tripping hazard.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.092 · Furniture, Equipment and Materials (1) (B) 2. D. · Correction due August 13, 2024

Requirements for the crib mattress/playpen padding/bedding were not met as evidenced by a non-fitted sheet was used.

Required correction: Sleeping equipment shall meet safety and sanitation requirements.

State licensing record

Jul 2024 Compliance monitoring visit 4 findings

Compliance monitoring visit · July 17, 2024

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers

The facility's outdoor space was not safe for children's activities as evidenced by missing parts of the covering matterial, leaving gaps and rises that are a tripping hazard.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.082 (1) (I) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due July 17, 2024

Hazardous items as follows were accessible to children: staff purse. The item(s) was/were located unlocked cabinet in the Beetle Bug room.

Required correction: Hazardous items shall be inaccessible to children.

5 CSR 25-500.082 (1) (G) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due July 17, 2024

The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by an electrical plate was missing in that no cover on exposed wire in a outlet box in the Beetle Bugs room.

Required correction: The facility shall use outlet covers or twist-lock outlets as required.

5 CSR 25-500.092 · Furniture, Equipment and Materials (1) (B) 2. D.

Requirements for the crib mattress/playpen padding/bedding were not met as evidenced by a non-fitted sheet was used.

Required correction: Sleeping equipment shall meet safety and sanitation requirements.

State licensing record

Feb 2024 Compliance verification visit 7 findings

Compliance verification visit · February 16, 2024

5 CSR 25-500.052 (2) (B) · Annual Requirements · Correction due January 31, 2024

The annual sanitation inspection was not approved.

Required correction: The facility shall submit evidence of compliance with annual sanitation requirements.

5 CSR 25-500.052 (2) (A) · Annual Requirements · Correction due January 29, 2024

The annual fire safety inspection was not conducted.

Required correction: The facility shall submit evidence of compliance with annual fire safety requirements.

5 CSR 25-500.082 (4) (A) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due February 14, 2024

Diapering requirements were not met as evidenced by the diapering table was not located where caregiver could maintain supervision of his/her group of children. The diapering table was located behind a wall in the kitchen/diapering area on both sides of the young toddlers room.

Required correction: The facility shall provide a safe and clean diapering table as required.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials · Correction due February 14, 2024

Furniture/equipment, Cubby Shelf, in Bumble Bees room was not in good condition as evidenced by chipped wood and exposed screw.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

5 CSR 25-500.102 (3) (C) · Personnel · Correction due February 14, 2024

A caregiver did not obtain one clock hour of training for each month of employment. The staff listed need the following information: J.H. needs 1 hour and Reece Tebble needs 3 hours.

Required correction: Required training hours shall be documented for each employee.

5 CSR 25-500.102 (3) (A) · Personnel · Correction due February 14, 2024

The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: S.K. needs seven hours.

Required correction: Required training hours shall be documented for each caregiver.

5 CSR 25-500.102 (4) (A) 3. · Personnel · Correction due February 14, 2024

Reece Tebble did not complete safe sleep training within 30 days of employment or volunteering at the facility.

Required correction: The department-approved safe sleep training must be completed within 30 days of employment or volunteering.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Jan 2024 Compliance monitoring visit 7 findings

Compliance monitoring visit · January 17, 2024

5 CSR 25-500.052 (2) (B) · Annual Requirements

The annual sanitation inspection was not approved.

Required correction: The facility shall submit evidence of compliance with annual sanitation requirements.

5 CSR 25-500.052 (2) (A) · Annual Requirements

The annual fire safety inspection was not conducted.

Required correction: The facility shall submit evidence of compliance with annual fire safety requirements.

5 CSR 25-500.082 (4) (A) · Physical Requirements of Group Day Care Homes and Day Care Centers

Diapering requirements were not met as evidenced by the diapering table was not located where caregiver could maintain supervision of his/her group of children. The diapering table was located behind a wall in the kitchen/diapering area on both sides of the young toddlers room.

Required correction: The facility shall provide a safe and clean diapering table as required.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials

Furniture/equipment, Cubby Shelf, in Bumble Bees room was not in good condition as evidenced by chipped wood and exposed screw.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

5 CSR 25-500.102 (3) (C) · Personnel

A caregiver did not obtain one clock hour of training for each month of employment. The staff listed need the following information: J.H. needs 1 hour and Reece Tebble needs 3 hours.

Required correction: Required training hours shall be documented for each employee.

5 CSR 25-500.102 (3) (A) · Personnel

The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: S.K. needs seven hours.

Required correction: Required training hours shall be documented for each caregiver.

5 CSR 25-500.102 (4) (A) 3. · Personnel

Reece Tebble did not complete safe sleep training within 30 days of employment or volunteering at the facility.

Required correction: The department-approved safe sleep training must be completed within 30 days of employment or volunteering.

Individual employees are shown by initials. The state’s report, linked above, names them in full.

State licensing record

Sep 2023 Compliance verification visit 5 findings

Compliance verification visit · September 28, 2023

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due September 28, 2023

The facility's outdoor space was not safe for children's activities as evidenced by cushion surface is loose and has holes. Making it a tripping hazard and unsafe.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due September 28, 2023

The facility's outdoor space was not safe for children's activities as evidenced by vent covers broken and with sharp edges.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due September 28, 2023

The walls located in 3-4 year old room was/were not in good condition as evidenced by base board coming loose.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due September 28, 2023

The walls located walls in in the preschool 4-5 room was/were not in good condition as evidenced by chipping and peeling paint.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials · Correction due September 28, 2023

Furniture/equipment, shelf, in Preschool 3-4 room was not in good condition as evidenced by screws missing and broken top shelf.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

State licensing record

Aug 2023 Compliance monitoring visit 7 findings

Compliance monitoring visit · August 30, 2023

5 CSR 25-500.082 (1) (C) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due August 30, 2023 · No longer on the state’s site as of September 25, 2026

Children were not restricted to approved space as evidenced by Kitchen door left open.

Required correction: Caregivers shall restrict children to approved space.

5 CSR 25-500.082 (1) (G) · Physical Requirements of Group Day Care Homes and Day Care Centers · Correction due August 30, 2023 · No longer on the state’s site as of September 25, 2026

The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that no cover on outlet by bathrooms in the preschool area.

Required correction: The facility shall use outlet covers or twist-lock outlets as required.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · No longer on the state’s site as of September 25, 2026

The walls located in 3-4 year old room was/were not in good condition as evidenced by base board coming loose.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers · No longer on the state’s site as of September 25, 2026

The facility's outdoor space was not safe for children's activities as evidenced by cushion surface is loose and has holes. Making it a tripping hazard and unsafe.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.082 (6) (A) 4. · Physical Requirements of Group Day Care Homes and Day Care Centers · No longer on the state’s site as of September 25, 2026

The facility's outdoor space was not safe for children's activities as evidenced by vent covers broken and with sharp edges.

Required correction: The outdoor play area shall be clean, safe and well-maintained as required.

5 CSR 25-500.082 (2) (A) 6. · Physical Requirements of Group Day Care Homes and Day Care Centers · No longer on the state’s site as of September 25, 2026

The walls located walls in in the preschool 4-5 room was/were not in good condition as evidenced by chipping and peeling paint.

Required correction: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

5 CSR 25-500.092 (1) (A) 1. · Furniture, Equipment and Materials · No longer on the state’s site as of September 25, 2026

Furniture/equipment, shelf, in Preschool 3-4 room was not in good condition as evidenced by screws missing and broken top shelf.

Required correction: The facility shall provide safe and clean furniture/equipment as required.

State licensing record

How the comparison is built

Routine visits: across Kansas City-area centers, the state cites something at about 8 in 9 routine visits (2,148 visits).

Openings, child care subsidies, cost, hours and late pickup, teaching approach, ratios and staff, a typical day, and sick and biting policies aren’t on this page.

Details

(816) 318-2251

Address
1500 W Foxwood Dr
License
002899501, active

Run Landis Child Development Center? Correct or add anything here, free.

Add what is missing
Sources and dates

Where every fact on this page came from, and when Shortlist last checked it against that source. Anything Shortlist could not source is named here rather than left blank.

State record

From Missouri DESE Office of Childhood’s published reports, last checked September 25, 2026.

Details

Medium means the middle half of Kansas City-area’s 187 licensed centers by state-licensed capacity: 56 to 134 children. Small is 8 to 55; large is 135 to 729.